Tech Team 2010:

Activity before the Conference

In progress:

Assemble power reels and adapters, projectors (5) etc ready to transport to the Conservatoire at 0800 on Saturday 17th July.

Alex and Q to take kit home overnight and unload with Richard at the Conservatoire on Saturday morning

Set-up for Tutorials on Saturday 17th July

We are using the New Lecture Theatre, Lecture Rooms 1,2 and 3 and the Band Room

Actions:

0800 Unload,

un-needed kit to crew room

Before start at 0915:

Projectors, power reels to all locations

Check that wifi is working OK in all locations, presenters have internet access.

In slower time:

Provide extra power as required in tutorial rooms and public areas.

Put up wifi posters

Set up laptop and printer in crew room

Pull kit from Band Room at 12:30

Set-up for Tutorials on Sunday 18th July

We are using the New Lecture Theatre, Lecture Rooms 1 and 2 and the Band Room.

The Board Room will be used from 11:00 for the Python Language Summit.

Around 17:30: Pull kit from all locations other than New Lecture

Monday 19th July 2010

08:00 set up in Adrian Boult Hall, Recital Hall, New Lecture Theatre and Library Theatre

?? run cable or set up MBM621 in the Library Theatre

19:30 Set up MBM621 at BMI for PSF meeting.

Tuesday 20th July 2010 and Wednesday 21st July

Improve and maintain availability of power strips and the wifi network.

(Had to set up 2 x DHCP servers and configure additional ADSL line to increase leases available and capacity - thanks Nick!)

Retrieve and store projectors overnight, distribute the following morning.

Thursday 22nd July

Around lunch-time pull power strips etc from rooms other than the Adrian Boult.

At end of day pull all kit and store and/or transport to Clockwork Systems.

Friday 23rd July and Saturday 24th July

Transport kit from Clockwork to BMI.

Includes 100m box of UTP, ends and crimping tool, tester. Duct tape.

Power reels and strips including European.

At least 6 access points. MBM621.

8-port switch.

Printer and paper.

Set up and test cabling and wi-fi for sprints as required.

At end of event pull all kit and transport back to Clockwork

Retrieve any items left at the Conservatoire

Tech Team (last edited 2010-07-20 22:13:41 by 82-69-206-105)